PHASE 1
Phase 1 Analysis culminated in the preparation of a Village/Area Analysis Report.
This report will be refined based on input from the Steering Committee, Village Staff and RTA and folded into the final report.
The individual sections can be downloaded below:
Analysis Report - Cover/TOC/Section 1 - Introduction
Analysis Report - Section 2 - Land Use
Analysis Report - Section 3 - Transportation
Analysis Report - Section 4 - Infrastructure
Analysis Report - Section 5 - Market
Analysis Report - Appendices
PHASE 2
Phase 2 included the development of concepts presented at the September 7th Community Workshop. The presentation can be downloaded below:
Community Workshop #2
PHASE 3
Phase 3 included the revision of concepts and the preparation of a final report. The presentation of the final report to the Village can be downloaded below:
Final Presentation
|